With sincere wishes of warmth and comfort!
Before installation, choose the place for stacking on the wall. INP has to be placed in the places with a direct action on heating devices and not to be shut with massive objects in case of heating working, leisure and play spaces.
Cut from a package for panel frame bend to the wall with a panel installation scheme and place it in the spaces made for drilling a hole under a dowel.
Be careful! To avoid electric potential in the drilled spaces, you have to make sure there is no under-plaster installation in the wall.
After installation, hang the panel and hook up at 220 W protected with GFI with conventional opertaing current not more than 30mA.